General Construction Services

GENERAL CONSTRUCTION SERVIES

Our construction services cover a broad range of industries, including education, healthcare, hospitality, retail, and government. We have a proven track record of successfully delivering projects on time and within budget, regardless of their complexity. Our team consists of highly skilled architects, engineers, project managers, and construction workers who work collaboratively to ensure that every project is completed to the highest standards of quality. We use the latest construction technologies and materials to ensure that our projects are not only durable but also energy-efficient and environmentally sustainable.

At KLSB, we prioritize safety in every aspect of our work. We adhere to strict safety protocols and regulations to ensure the safety of our workers and clients. We believe that communication is key to a successful construction project. Our team is always available to answer any questions or concerns that our clients may have throughout the project. We provide regular updates to keep our clients informed of the progress of their project.

We are committed to delivering high-quality, timely, and cost-effective construction services to our clients. We pride ourselves on our exceptional customer service, attention to detail, and commitment to safety. 

CONSTRUCTION SUPPORT SERVICES

LICENSE & REGISTRATION

EXPERIENCE LIST

GENERAL CONSTRUCTION SERVICES

Year : 2021 | Client : SDMax Sdn Bhd

Project: Renovation work on existing office, existing cafeteria, new arch way and new single story office” at Teluk Ramunia Yard, Pengerang, Johor

Year: 2019 | Client: Grand Teknik

Project: Fabrication of Concrete for Footing Stand for Melaka - Supply and design footing Concrete for footing, Provide mole and lab test report for concrete, Arrangement logistic to delivery

Year : 2019 | Client: BaseNET Technology Sdn Bhd

Project: Provision of Electrical Material & Supply Raw Material Cable Tray and accessories - Manpower arrangement site survey and verification for Material Take Off (MTO), Install cable tray as suitable on-site arrangement, Arrangement logistic to delivery

Year:2019 | Client: Grand Teknik

Project: Provision of Scaffolding for Erection, Dismantle and Material Rental - Supply of Manpower for Installation Scaffolding

Scaffold for Cable Tray Installation, Access Point Installation, Supply Scaffold Material, Arrangement Logistic for Scaffold Material

Year: 2019 | Client: Grand Teknik

Project: Provision of Fabrication Access Point Stand (AP Stand) Support for Melaka MRCSB - Supply Material and Fabrication work 

Site Survey and Design Access Point Stand as per suitable on site, Fabrication work follow as per PTS practice,  Arrangement to welder qualification test (WQT), Provide Welding Procedure Standard (WPS) follow as per PTS practice, Arrangement to witness and Inspection of Material, Equipment and tools, Daily progress report

Year:2019 | Client : BaseNET Technology Sdn Bhd / Petronas ICT

Project: Provision of Manpower Supply and Equipment for Abseiler (Rope Access) for Rapid Pengerang (Abseiler Level 1, Level 2 and Level 3)

Provide Method ff Statement for Abseiler (rope access), Provide the JHA and review challenge with client, Conduct for Demonstration of Abseiler (Rope Access) with client, Installation cable using Abseiler (Rope Access), Provide Method for Statement for Abseiler, Arrangement manpower to site

Year: 2018 | Client: BaseNET Technology Sdn Bhd / Petronas ICT

Project: Installation and Cable Pulling Works (Power and Signal) for Basenet Technology (Manpower) for Pervasive Wireless Project Rapid Pengerang

Pulling power cable power and Signal cable, Operate machinery’s Boom Lift and secor lift for installation cable and equipment.

Year : 2018 | Client : BaseNET Technology Sdn Bhd / Petronas ICT

Project: Provision of Scaffolding for Erection, Dismantle and Material Rental (Rapid Pengerang Package 2, 3 4, 22 & 1)

Scaffold for Cable Tray Installation, Access Point Installation  , Supply Scaffold Material, Arrangement Logistic for Scaffold Material

Year :2018 | Client : BaseNET Technology Sdn Bhd / Petronas ICT

Project: Installation, Cable Pulling and Electrical Termination Works (Man Power) Pervasive Wireless Project Rapid Pengerang

Year :2017 | Client : KEJURUTERAAN QKS SDN BHD (KQKS)

Project: Provision of Scaffolding for Erection, Dismantle and Material Rental for the Installation of Cable Tray and Piping System Rapid Package 14 Pengerang

Scaffold for Cable Tray Installation, Piping Installation, Painting and Insulation, Supply Scaffold Material, Arrangement Logistic for Scaffold Material

Year :2017 | Client : System Protection & Maintenance Sdn Bhd

Project: Provision of Scaffolding for Erection, Dismantle and Material Rental (Rapid Pengerang Package 14)

Scaffold for Cable Tray Installation, Piping Installation, Painting and Insulation, Supply Scaffold Material, Arrangement Logistic for Scaffold Material

Year:2016 | Client: Petronas Gas Berhad

Project: Supply , Delivery, Fabrication & Installation of Gas Cooler Fan Netting For Unit #1 and Unit #2 at Segamat Compressor Station

EXPERIENCE LIST

GENERAL SERVICES & SUPPLY TRADING

Year: 2019 | Client: KL-Kuala Selangor Expressway (LATAR Expressway)

Project: Proposed Repair Works of Damage Water Tank at Kompleks Operasi KL – Kuala Selangor Expressway (LATAR)

Year: 2019 | Client: MARA / KKTM Kemaman

Project: Cadangan Membekal, Menghantar, Memasang, Menyusun, Mengujilari Serta Mentauliah Peralatan Latihan Dan Pembelajaran Diploma Teknologi Kejuruteraan Loji (Operasi Pesisir) Di Kolej Kemahiran Tinggi Mara (IKM) Kemaman, Terengganu

Year: 2019 | Client: A.S ANAK BUKIT SDN BHD

Project: PERKHIDMATAN PENCUCIAN CAWANGAN MINI BSN NEGERI SELANGOR (BANK SIMPANAN NASIONAL)

Year: 2019 | Client: NORTHFIELD FM SDN BHD

Project: PERKHIDMATAN MENCUCI DAN MEMBERSIH DI UNIVERSITY ANTARABANGSA ALBUKHARY, ALOR SETAR, KEDAH.

Year: 2019 | Client: KPDNKK

Project: Penyedian Kelengkapan Logistik, Makanan dan Minuman, Serta Kemudahan Bagi Karnival Kepenggunaan Sempena Kempen Beli Barangan Malaysia Peringkat Kedah 2019

Year: 2019 | Client: KPDNHEP

Project: Perkhidmatan Pelaksanaan Karnival Kempen beli Barangan Malaysia (KBBM) Peringkat Kebangsaan 2019 Anjuran Kementrian Perdagangan Dalam Negeri dan Hal Ehwal Penguna (KPDNHEP)

Year: 2018 | Client: KL-Kuala Selangor Expressway (LATAR Expressway)

Project: Proposed Repair Works Of Damaged Toll Plaza Canopy At Toll Plaza Kuang Barat KL – Kuala Selangor Expressway (LATAR)

Year: 2018 | Client: KCJ ENGINEERING SDN BHD

Project: KERJA-KERJA PERKHIDMATAN PEMBERSIHAN DAN KAWALAN SERANGGA BAGI KEMENTERIAN PEMBANGUNAN WANITA DAN KEMAJUAN MASYARAKAT BLOK 4G11, PRESINT 4, PUTRAJAYA

Year: 2018 | Client: KCJ ENGINEERING SDN BHD

Project: KERJA-KERJA PERKHIDMATAN PEMBERSIHAN DAN KAWALAN SERANGGA BAGI BLOK G, MENARA KERJA RAYA, JALAN SULTAN SALAHUDDIN KUALA LUMPUR.

Year: 2018 | Client: A.S ANAK BUKIT SDN BHD

Project: PERKHIDMATAN PENCUCIAN CAWANGAN MINI BSN WILAYAH PERSEKUTUAN KUALA LUMPUR..

Year: 2017 | Client: KL-Kuala Selangor Expressway (LATAR Expressway)

Project: Proposed Repair Work at Tol Plaza Kuang Barat and Staff Quarters KL – Kuala Selangor Expressway (LATAR)

Year: 2017 | Client: System Protection & Maintenance Sdn Bhd

Project: Installation of Network Cable, Wireless System, Network Related Device and Testing & Commissioning

Supply, Install, and configuration of Network Cable, Wireless AP, UPS, Truncking, Printer

Year: 2016 | Client: Jabatan Hal Ehwal Khas (JASA)

Project: Kerja-kerja Pembaikan & Penyelengaraan Rumah Damai

Year: 2016 | Client: Tenaga Nasional Berhad

Project: Pembelian Dan Pembekalan Bot Dan Jaket Keselamatan Untuk Projek Hidroelektrik Ulu Jelai, Cameron Highlands, Pahang (Aluminium Boat with YAMAHA Engine 30HP Long Shaft )

Year: 2016 | Client: Unit Pencegah Penyeludupan (UPP), Pengkalan Kubor, Tumpat, Kelantan

Project: Membekal, Memasang, Memberi Latihan Dan Menguji Jalan Bot UPP 01 Untuk Unit Pencegah Penyeludupan

Year: 2016 | Client: Unit Tindakan Khas (UTK), Polis Diraja Malaysia, Bukit Aman

Project: Kerja-Kerja Penyelenggaraan Bot Ronda Zodiac Fc470 Bot No. 9 Untuk Unit Tindakan Khas

Year: 2016 | Client: PETRONAS Gas Berhad

Project: Supply of Display and Integrated Mini PC For Petronas Gas Berhad GTR

Year: 2016 | Client: UNIT PENGURUSAN KOMPETENSI (JPS)

Project: Membekal Cenderahati Persaraan berupa Jam Tangan

Year: 2016 | Client: Jabatan Logistik Ibu Pejabat PDRM Bukit Aman

Project: Alatan Pejabat Untuk Polis Diraja Malaysia

Year: 2016 | Client: NORTHFIELD FM SDN BHD

Project: PERKHIDMATAN HOUSEKEEPING SOUQ ALBUKHARY ALOR SETAR, KEDAH.

Year: 2015 | Client: Institut Genom Malaysia (MGI)

Project: Modification and Installation of Cold Room Chiller System at Pusat DNA Negara, GENOM

Installation of Cold Room Inclusive of Electrical and Control System Cabling

Year: 2012 | Client: Malaysian Aviation Training Academy (MATA), Kuantan

Project: MATA New Office and Educational Block at Putra Square, Kuantan, Pahang (Malaysian Aviation Training Academy (MATA)

Supply and Installation of Network CAT5 Cable, Outlet, Lan Switch, PABX, Phone, Mechanical & Electrical Lab Equipment Supply and Install (mechanical lab system equipment inclusive the required machinery and firefighting system)